Union Minister for Health Dr. Thet Khaing Win and party attended the opening ceremony new vaccine cold storage depot in Yangon on 15 June and they also attended the opening ceremony of two-storey new building of the Public Hospital in Hmaw Bi Township on 16 June.
The 3-storey new vaccine cold storage depot in Yangon is 60 feet long, 48 feet wide, 39 feet high. The cost of the building including water and electricity was estimated at K7.087 billion (USD 337,500). There are one Walk-in Cooler (30m3 capacity), one Walk-in Freezer (20m3 capacity), one washing room, one dry store room and one cold room office at the ground floor of the building. There are one office room and three function rooms at the first floor and there are one training hall, one store room, one function room and one food preparation room at the second floor.
The two-story new building of the public hospital in Hmawbi Township is 16,800 square feet. It is constructed with MMK 1,159.200 million of State Budget on 18 August 2023 and it has completed on 30 May 2024. There are one emergency room, Maternity Observation Bay, two maternity rooms, one room for Postnatal care of mother, one neonatal intensive care unit, one store room and dispensary at the ground floor of the building. There are wards for women, the intensive care unit and the pediatric treatment room at the first floor of the building, it is reported.
Source: Myawady Daily Newspaper (17-6-2024)
- The 3-storey new vaccine cold storage depot in Yangon is 60 feet long, 48 feet wide, 39 feet high. The cost of the building including water and electricity was estimated at K7.087 billion (USD 337,500).
- The two-story new building of the public hospital in Hmawbi Township is 16,800 square feet. It is constructed with K1,159.200 million of State Budget.